Skip to main content
Licensed & Insured • 11+ Years in Business • Locally Owned & Operated

Concrete Services in Waukee, Iowa — Your concrete, our crew, one contract

Waukee won't let a new public sidewalk sit on sand: its standards call for 1 to 2 inches of tamped aggregate under at least 4 inches of concrete.

4.9(100+ reviews)
11+ Years in Business
Locally Owned & Operated
JLB Foundation Repair
Free 45-Minute Analysis + Written Report

Get a precise analysis of your concrete project, and a clear estimate on what the work will cost.

4.9★ (100+ reviews) · 11+ Years · Transferable Warranty
1Contact
2Location
3Details
Please enter your name.
Please enter a valid phone number.
Please enter a valid email.
Please enter your address.
Please enter a valid zip code.
Please select a service.

What are you seeing?

Takes 30 seconds. We'll call within 24 hours.

Your info is safe with us. We never share your data.
BBB
A+
Accredited Business
Angi
Top Rated
Service Provider
State Licensed
KS, MO & IA
Licensed & Insured

Concrete Services in Waukee, Iowa

Waukee homeowners can hire JLB for a driveway, a patio, a sidewalk, a pool deck or a retaining wall, finished in broom, stamped or stained concrete, and for a fiberglass pool set by the same crew that pours the deck around it. Estimates are free and done on-site.

Waukee has been among the fastest-growing cities in Iowa, with large-scale developments going up from the 2010s to now on upland prairie at the western edge of the metro, in Dallas County.

What is a new Waukee driveway or patio actually sitting on?

Clay-heavy ground: Des Moines Lobe glacial till, laid down by the last glacier. Building codes in the area put frost depth at 42 inches, and as this clay freezes it pushes up, then settles back when it thaws, which is why the base under a slab gets as much attention as the slab.

JLB compacts and grades that base so the concrete bears evenly, then matches the thickness to the load: four inches for a car driveway, and a thicker, reinforced slab where trucks, RVs or trailers will park. On a patio we add rebar or mesh where the load calls for it and saw-cut control joints, cuts that steer the shrinkage cracking every slab gets into clean, planned lines. On a wide or stamped patio, that joint layout is designed in from the start.

What do Waukee's standards ask of a new public sidewalk?

Sidewalk and driveway-approach work in the public right-of-way, the public strip along the street, goes through Waukee's "Right of Way or Utility Easement Permit, including Sidewalk/Approach." The city's Sidewalk Installation Design Standards then set out the walk itself. In the order a pour happens:

  1. Base. Displaced material, soft spots and vegetation come out. Then 1 to 2 inches of aggregate goes down on a firm surface, tamped with at least a 50-pound hand tamper. Compacted 1-inch roadstone is acceptable; sand is not.
  2. Forms and thickness. The walk is 4 feet wide, set 1 foot toward the street from the lot line, and at least 4 inches thick. Where a driveway crosses it, it's at least 6 inches thick or as thick as the driveway, whichever is greater. The concrete is Portland cement concrete, in the mix the standards call C-4.
  3. Joints. Full-depth ½-inch expansion joints, gaps that let neighboring slabs move, go at property lines, where the walk meets a driveway or an existing slab, at the street, at the end of each workday, and wherever a pour stops for 30 minutes or more. Contraction joints, the cuts that tell the walk where to crack, are spaced at the sidewalk's width.
  4. Slope. Side-to-side tilt is ¼ inch per foot by preference, and ½ inch per foot at most.
  5. Curing. Liquid curing compound goes on undiluted, at 0.03 gallons per square yard.
Financing

Two Ways to Pay Over Time

12 Months Same As Cash

Pay the full balance within 12 months and you pay no interest.

5 Years at 6.99% APR

A lower monthly payment, spread over 60 months.

On approved credit. Ask for full terms at your free estimate.

No need to put the project off another season.

Financing

Two Ways to Pay for It

12 Months Same As Cash

Pay the full balance within 12 months and you pay no interest.

Best if you can pay it off within a year.

5 Years at 6.99% APR

A lower monthly payment, spread over 60 months.

Best for bigger projects.

On approved credit. Ask for full terms at your free estimate.

No need to put the project off another season.

What Waukee Property Owners Ask Before a Pour

Only if you agree to it. Waukee's standards keep a public sidewalk at least 3 feet from tree trunks, and from the back of the curb, unless the owner consents.

Where the walk tilts more than ¼ inch per foot across a driveway, the city's standards have it transition back to ¼ inch per foot within 12 feet on either side.

Under Waukee Code §136.05, the city may send a certified-mail notice to repair it within a reasonable time. If the work still isn't done, the city may do it and assess the cost against the property like a property tax.

Our Central Iowa Offices

JLB Basement Waterproofing & Foundation Repair — Van Meter

325 Grand St
Van Meter, IA, 50261
(515) 642-3406 View on Google Maps

JLB Basement Waterproofing & Foundation Repair — Des Moines

97 Indiana Ave Suite #1
Des Moines, IA, 50314
(515) 717-8560 View on Google Maps

Ready to Pour? Get a Free Estimate.

A free on-site estimate tells you exactly what your concrete project in Waukee takes — and what it costs. Call (515) 717-8560.

Call Now (515) 717-8560